Rustic Crust Rebuilds Production Facility Destroyed by Fire
Rustic Crust, Pittsfield, N.H., is breaking ground on a new production facility that was leveled by a fire earlier this year.
The 2-story, 27,000-square-foot facility—30% larger than the original structure—will be completed and operating later this fall, says Brad Sterl, chief executive officer. The project contractor is Mark Carrier Construction, Inc. (MCCI), Manchester, N.H., and design firms include John Jordan Design, Canterbury, N.H., and Hillside Design Group, Merrimack, N.H.