After a devastating 2023 fire, the family business returns to full production with a redesigned facility focused on flow, flexibility and long-term growth.
This collaboration brings advanced 4-way shuttle technology directly into facility planning, engineering and construction, eliminating the disconnect that often exists between automation systems and the buildings that house them.